Skip to main content

New Sewer Connection Permits

Residential Connection

If you want to connect to the public sewer and your property is not currently served by the District, you will need to do the following:

  • Check the District Map (link is located to the right) and find your property.
  • If your property is located within the District boundaries and near an existing public sewer main line you may be able to get a permit to connect a private lateral to the District sewer.  An Application for a new Residential Connection will need to be completed, and connection fees paid in order to be permitted to connect.   
  • A link to the Application for New Connection Residential is provided below.
  • The applicant will also need to obtain a Lateral Construction Permit (Plumbing Permit) from the District as part of the New Connection process. 
  • Plans showing the plumbing in the dwelling and how the lateral will connect to the sewer will need to be provided with the application. 
  • If your property is located within the District boundaries but there is no public sewer near your property, you may be able to connect but a sewer extension will be needed to be constructed by you in order to do this.  Call the District Engineer at (831) 624-1248 to inquire about the steps to take to do this. 
Application for new residential connection 

Commercial/Restaurants

If you have a commercial establishment that is not connected to the District sewer system and want to connect or are remodeling a commercial establishment, you will need to do the following:

  • If your business is located within the District boundaries and near an existing public sewer main line you may be able to get a permit to connect a private lateral to the District Sewer. An Application for new Comercial Connection will need to be completed, and connection fees paid in order to be permitted to connect.   
  • If there is a "Change of Use", a remodel, or a new commercial establishment connecting to the District sewer, a Commercial Connection Permit Application will need to be submitted to the District and all fees paid.
  • A link to the Commercial Connection Application is provided below.   
  • Plans showing the plumbing in the building and how the lateral will connect to the sewer will need to be provided with the application.
  • The applicant will also need to obtain a Lateral Construction Permit from the District as part of the New Connection process if any private lateral work will be done. 
  • All commercial kitchens are required to submit plans showing grease traps/interceptors as part of the Commercial Connection Application. 
  • Commercial Kitchens / Restaurants are subject to the District's Pretreatment Program. A link to the annual Pretreatment Discharge Permit Application is provided below. 
Application for New Connection Commercial-fillable.pdf

Connection Fees

Schedule Of Connection Fees-Effective March 2024.pdf

 

 

Join our mailing list